电缆敷设前应进行的检查工作
[来源:http://www.dianlanguagou.com.cn] [作者:aowl] [日期:18-03-21] [浏览次数:]
(1)支架应齐全、油漆完整。 (1) the support should be complete and the paint is complete. (2)电缆型号、电压、规格符合设计。 (2) the cable model, voltage and specification conform to the design. (3)电缆绝缘良好,当对油纸电缆的密封有怀疑时,应进行受潮判断;直埋电缆与小底电缆应经直流耐压试难合格;充油电缆的油样应试验合格。 (3) the cable is well insulated. When it is suspected of the sealing of the oil paper cable, it should be dampened. The direct buried cable and the small bottom cable should be subjected to DC withstand voltage test, and the oil sample of the oil filled cable should be qualified. (4)充油电缆的油压不宜低于1.47MPa。 (4) the oil pressure of the oil filled cable should not be less than 1.47MPa.