10KV交联电缆热缩式制作户内终端头的过程
[来源:http://www.dianlanguagou.com.cn] [作者:不详] [日期:17-02-14] [浏览次数:]
简述10KV交联电缆热缩式制作户内终端头的过程? Briefly 10 kv crosslinking cable heat shrinkable type production process of indoor terminal head? 答;(1)准备阶段:检查热缩电缆附件是否齐备,型号是否相配,检查并确认电缆有无潮气后,检查电缆。 A; (1) preparation phase: check whether heat shrinkable cable accessories, complete model is suitable, check and confirm the cable after the presence of moisture, check the cable. (2)切除多余电缆,根据现场情况决定电缆长度。 (2) removal of excess cable, according to determine the length of the cable on site. (3)剥除护层。 (3) the stripping protective layer. (4)焊接接地线,将接地线焊接在钢带上。 (4) welding ground wire, ground wire welding in the steel belt. (5)填充三叉口及绕包密封胶。 (5) fill three prong and winding and sealant. (6)安装三芯分支护套,将护套套入根部,从中部开始收缩,先往根部,再往指部。 (6) install the three core branch sheath, to protect a condom into root, from the middle contraction, first to our roots and go back to the finger. (7)剥铜 带和外半导电层,剥切三芯分支套口20mm以上的铜带,严禁损伤主绝缘,清除干净半导电层。 (7) strip copper strip and outer semiconducting layers, cutting three core branch set of mouth more than 20 mm copper strip, it is forbidden to damage the main insulation, clean semi-conducting layer. (8)安装应力管,管口端部分支套对接后热缩。 Install stress tube (8), pipe end part of a set of hot shrinkage after docking. (9)安装接线端子。 (9) install the terminal. (10)安装绝缘管。 Install the insulation tube (10). (11)安装密封管。 Install the sealing tube (11). (12)核相后安装相色管。 (12) nuclear phase after installation phase color tube.
版权所有河北宽大机械设备制造有限公司 网址:www.dianlanguagou.com.cn 冀ICP备2022015529号-3
推荐:电缆挂钩,矿用电缆挂钩,矿用电缆夹,矿用电缆夹板,电缆夹h型电缆夹、o型电缆夹、u型电缆夹、c型电缆夹、日字型电缆夹等

友链:急流槽模具 六棱块模具 检查井钢模具 模锻件 网站建设及优化遨游网络